JRAD

Earned Value Management (EVM) Specialist

Job Title:

Earned Value Management (EVM) Specialist

Job Description
Location: Frederick, MD
Position Type: Full-Time
Level: Seeking candidates at all levels from entry level to senior positions requiring advanced degrees and experience.
Travel Required: Travel may be required to support customer mission requirements but is not anticipated to exceed 25%.

 
Role and Responsibilities:

  • Perform all aspects of Earned Value Management.
  • Conduct analysis and provide advice regarding EVM tools and principles.
  • Collect and analyze cost performance data reports in order to identify cost, schedule, and performance trends and deviations and recommend corrective action.
  • Assist the Contractor to achieve certification of their EVM system.
  • Participate in working groups or IPTs.
  • Assist with planning and execution of the Integrated Baseline Review (IBR).
  • Additional duties commensurate with position roles and responsibilities may be required by specific customers.

Minimum Required Skills and Education:

  • Bachelor’s Degree or equivalent experience.
  • Two (2) years of relevant experience.
  • *Some position levels and specific customer requirements may require a degree in an Engineering specific related discipline.

Security Clearance:

  • Must be able to obtain and maintain a DoD clearance.

 
JRAD is an Equal Opportunity Employer Veterans/Disabled

Apply Now